• Pommes_für_dein_Balg@feddit.org
    link
    fedilink
    arrow-up
    1
    ·
    11 days ago

    I’d obviously plan the initial setup, start with connecting ports close together via short cables, then put the longer connections on top, avoid unnecessary crossings.
    And when switching out a cable, look for the most direct path

    • 0x0@infosec.pub
      link
      fedilink
      English
      arrow-up
      4
      ·
      11 days ago

      Cable trays is the magic word. Any rack larger than 2u that see frequent patching need them no matter what accounting thinks.